 |
S.T.
Associates |
Land & Engineering Surveyors
Building
on our Experience
|
| A1067
Attlebridge,
Norfolk SITE
SURVEY |
 |
| 3.3
Km road survey to design a leachate rising
main pipeline for RMC Environmental Services.
|
|
|
|
| Billing
Aquadrome,
Northampton SITE
SURVEY |
| Comprehensive
road survey providing information to design
a new entrance and upgraded service road.Site
included pubic highway. |
|

|
|
|
| Park
Road, Ipswich
SITE
SURVEY
|
|
|
| Site
survey of disused and active underground reservoirs.
Access arranged through Anglian Water. |
|
|
|
| Fort
Wallington, Fareham PLANS
AND ELEVATIONS |
 |
| The
site of a Roman hill fort provided a challenging
problem for developers of the industrial estate
built on the remains. |
|
|
|
|
|
| Stapleford
Mill
SITE
SURVEY FLOOD
DEFENCES |
| Site
survey of dwelling and surrounding river banks
and river. A very interesting project where,
with the recent high levels of rainwater, a
converted Mill required further protection. more.... |
|
|
|
|
| Gun
Wharf Quay, Wightlink Pier, Portsmouth |
|
|
|
|
| Woodbridge
SITE
SURVEY GPS
SERVICES |
| Site
survey, services
confirmation, and a 5km road survey. An
active residential site passing back to
civilian use entailed an assessment of
the existing infrastructure, in order
to design a new rising main, and connection
to the main infrastructure.
|
more...
|
|
|
|
|
| Clapham,
London SERVICES |
 |
| Locating
existing services to design |
| a
connection for new infrastructure. |
| Client:
DSA |
| Date:June
2002 |
|
|
|
|
|
| Nottingham
SELF
BUILD SITE
SURVEY |
| Utilising
a large garden area is becoming an attractive
economic option, as in this case. We provide
a service for selfbuild clients, supplying a
digital survey, paper plots, CD-ROMs, and photographs
to both the client and design team. |
|
|
|
| Working
for house manufactures and suppliers
acting
as clients representative, or
directly for members of the public,
presented an opportunity to produce an
Information
Sheet
which answers most frequently asked questions.
See more on the Selfbuild
page. more... |
|
|
Rail Division Norton Bridge Station, Staffordshire RAIL
|
|
Requirement.
To install a new pedestrian foot bridge to access the central
platform.
|
 |
.Product.
Carried
out in two stages, a full site survey of the station car park,
platforms and 200m in each direction was undertaken. The 25,000v
overhead lines could be surveyed using Reflectorless instruments. We
have recently surveyed Solihull, Apsley and Stoke Stations Platforms
and car parks. Addtional Work is planned at Soho depot, Stoke
and Aplsley Stations
more.. |
|
| Pinxton
Signal Box
RAIL |
| A
just one of a series of signal box surveys to submit
plans for new access stairways.Carried
out adjacent operational track, a survey of the building
and surrounding features was recorded in co-operation
with the ground investigation team. more... |
|
|
|
| Three
Spires, Coventry
RAIL |
| Site
survey and site investigation of operational Railway
embankment.Clients
requirements were for New camera locations to be designed
on an embankment close to an operational rail track.
|
|
|
| Working
with Dsa Rail and WS Atkins ground investigation team.
more...
|
|
|