Requirement.
To install a new pedestrian foot bridge to access the central
platform.
A
new footbridge at Norton Bridge required a topographical survey
to design and arrange crane access to the site. With trains
speeds over 100mph, working safely on stations and track surveys
is of paramount importance. Every team member is fully trained
in personal trackside safety and awareness. |
|
 |
The
platforms could be surveyed during daylight hours.
Using the Reflectorless mode, measurements could be taken
safely to the overhead power lines and the existing footbridge. |
|
 |
The
car park, adjacent Water Authority compound, and highway were
also included. The compound was surveyed without access being
necessary, thus avoiding the need to arrange a key holder.
Again this was achieved using Reflectorless technology. Accuracy
was maintained, and the necessary information was produced
for the client. |
|
 |
200m
metres of track in each direction was also required. This
had to be surveyed during Engineering hours, which included
two Saturday Night possessions.
We
have also recently carried out a full survey of Sohlihull
and Apsley Stations.Current work includes Camden and Soho
Depots, Apsley and Stoke Stations.
|
|
|
Three Spires, Coventry
RAIL
|
|
Site
survey and site investigation of operational Railway embankment.
|
| Clients
requirements. |
| New
camera locations to be established on an embankment
close to railway track. |
|
Positions
of ground investigation bore hole and window samples was logged.
Working together level of these locations were included on
the topographical survey. |
 |
 |
Additional
detail, such as the road bridge crossing the tracks and
adjacent properties was collected quickly and efficiently
with a reflectorless Total Station.
|
Working
with Dsa Rail and WS Akins ground investigation team.
|
 |
|
Rail - PinxtonRAIL |
 |
Date:Feb
2003.
A just one of a series of signal box surveys to submit
plans for new access stairways.Carried
adjacent operational track, a survey of the building and surrounding
features was recorded in co-operation with the ground investigation
team. |
|
 |
A
full site survey and photographs of the signal box and surrounding
area were produced. Digital data was supplied to the client.vey
of the signal box and suroundin |
|
|